Hale Wai

Hale Wai
House on Clear water

Saturday, February 25, 2012

Concrete Slab poured, framing begun 2/20-24/12

Lots going on here this week. On Monday framing was begun, the lower level is being raised.  On Tuesday two concrete trucks were here and the crew poured and smoothed the concrete slab.  Things are taking shape!  Bella and Grey were here too, and were busy in their sand pile, pulling up buried roots.  Floor joists arrived on Wed, and the carpenters have been building the deck as well as the main floors of the house. By Friday we have the lower level framed, and the upperlevel is beginning to take shape.  (lots of photos!)

 Monday :Framing has begun. View from Dock. 

View from Bird feeder

Began framing on Monday, Feb 20, 2012

This shows the framing for two windows on the side of Bill's office.  We will be using ones that we saved when the Carolina Room was removed.

Bella and Greyson hard at work in the sand pile.

Tuesday...Pouring concrete to form the step into the house on the lower level.


Beginning the concrete for the slab.  They are working on the ledge which will run across the side of the house.the ledge will be used as a storage area.



Wed, Floor Joists arrive, carpenters begin assembly of 2nd floor.


Our view will be great when the wall and these sliding glass doors are gone!

Ready for the floor and the framing to rise.




Thursday:  We can walk on the floor of the living room and bedroom




Framing photos taken Friday, Feb 24, 2011

 Our new bedroom

Our new livingroom.  Our view from the diningroom through the livingroom will be pretty dramatic!


Deck--eventually the part below the deck will be enclosed as storage area for outdoor equipment. 

View from Birdfeeder



View from dock

Inside rec room

Bill's office

Ledge will become storage area
 

Thursday, February 23, 2012

What will the addition look like?

I've had a few people ask to see what the addition will look like when completed. Here are some sketches by Bill to show the interior and exterior views.  (In case your interested, he uses a computer program called "sketch-up" for this style of drawing)

View from birdfeeder. Shows outdoor covered deck, which may be screened in, Next to it is the new livingroom.  Below the living room is a rec room/storage area.  The next section over is our new master bedroom on the upper floor, Bill's office on the lower.

This shows the floor plan. The dining room and kitchen are being renovated, the livingroom, deck, and bedroom are to be added.  the space next to the bedroom will be the master bath and closets.

View looking out to new livingroom space.

The landscaping is different, but this shows the look from our dock.


Saturday, February 18, 2012

Feb 13-18, 2012


Brick Columns will support the deck.


Making good progress.  We are ready to have the concrete slab poured next week.  The plumbers were here putting in the necessary pipes that will be beneath the slab.  The ground received a "pre-construction" termite treatment.  Preparations have been made to be ready for framing.  The lumber has been delivered!

Also--moved out of back bedroom and demo has begun there.  We still have the kitchen and livingroom for a few more weeks.

View from birdfeeder

Ready for slab


Plumbers have been here.  Framers have prepared for concrete slab
  

Here comes the Lumber!


Ready to begin framing!

Monday, February 13, 2012

February 12, 2012

This past week we have gone back to winter temperatures--brrr.  But progress continues.  The foundation walls have been built, and the brick columns that will support the porch/deck are in place. Our Live Oak tree has been planted near the dock.

Bella and Grey were down here this past weekend and had alot of fun playing in the big pile of sand that was created when the digging occurred.






Bella and Grey inspect the progress

Waterproofing painted on, floor smoothed out and ready for concrete.

Feb 9, 2012--Live Oak arrives!

For Christmas last year, Bill and I decided that we wanted to get a "Live Oak" that would be planted down by the lake.  It has arrived and has been planted.  We decided to get one that would be substantial to begin with, around 20 feet tall.  It needs to be watered regularly for awhile, but should be able to grow well in our sandy soil near the lake.  It is sure to be a pleasant shady spot to be near in the summer!
Guiding the tree from the truck.

Moving the tree to the back of the house.
                    
Raising the tree.

Tree up





Saturday, February 4, 2012

February 3, 2012

It's been a beautiful, sunny week.  Highs near 70 several days!  The inspector has OK'd all of the footings . The Concrete block and Bricks have been delivered.  We are ready to start construction!