Lots going on here this week. On Monday framing was begun, the lower level is being raised. On Tuesday two concrete trucks were here and the crew poured and smoothed the concrete slab. Things are taking shape! Bella and Grey were here too, and were busy in their sand pile, pulling up buried roots. Floor joists arrived on Wed, and the carpenters have been building the deck as well as the main floors of the house. By Friday we have the lower level framed, and the upperlevel is beginning to take shape. (lots of photos!)
.jpg) |
| Monday :Framing has begun. View from Dock. |
.jpg) |
| View from Bird feeder |
.jpg) |
| Began framing on Monday, Feb 20, 2012 |
.jpg) |
| This shows the framing for two windows on the side of Bill's office. We will be using ones that we saved when the Carolina Room was removed. |
.jpg) |
| Bella and Greyson hard at work in the sand pile. |
+(2).jpg) |
| Tuesday...Pouring concrete to form the step into the house on the lower level. |
 |
Beginning the concrete for the slab. They are working on the ledge which will run across the side of the house.the ledge will be used as a storage area.
Wed, Floor Joists arrive, carpenters begin assembly of 2nd floor.
.jpg) |
| Our view will be great when the wall and these sliding glass doors are gone! |
 |
| Ready for the floor and the framing to rise. |
Thursday: We can walk on the floor of the living room and bedroom
Framing photos taken Friday, Feb 24, 2011
Our new bedroom
.jpg) |
| Our new livingroom. Our view from the diningroom through the livingroom will be pretty dramatic! |
|
.jpg) |
| Deck--eventually the part below the deck will be enclosed as storage area for outdoor equipment. |
.jpg) |
| View from Birdfeeder |
.jpg) |
| View from dock |
.jpg) |
| Inside rec room |
.jpg) |
| Bill's office |
.jpg) |
| Ledge will become storage area |