There has been alot of progress since my last post.  
The finish carpenters, Kevin Pealo and AL Jacobs have been here hanging doors, building stairs, closet interiors, putting up the medicine cabinets, framing the doors and windows and putting on the moulding.  The crews from Fred Griffith have completed laying the wood for the deck, and have fnished putting up the siding.  The Daniel Croom's tile crew has laid the bathroom tile in both bathrooms. 
The tray ceiling has been framed.

detail of moulding for ceiling.


Doors have been hung and trimmed out.





Window sills and frames
Stairs complete.


      The closets in the master bedroom are going to be great!  Lots of shelves and spaces for hanging things.


Bill's closet has shelves and double hanging rods.  He also has shelves that will also serve as the access to the attic.


The closet off the Master Bathroom is officially called, "Maureen's Closet, but she is willing to share some of the Space with Bill.  There are multiple hanging areas and shelving units that have been built in.



.
Shelves in the linen closet have been built.  The mirrored medicine cabinets have been installed and framed.

We have had the same tile installed in the master bathroom and in the bathroom on the lower level.

We are starting to get the feel of what the porch will be like.  the siding will be painted a shade of cedar, the ceiling will be heint blue.  Trim will be white.



The Kitchen Cabinets have arrived!  (May 11).  They will be installed next week.  Also scheduled for next week are the painters.
The cabinets fill the livingroom space!
Not too much longer now!