Many people here working this week, YEAH!
![]() |
Electricians working on wiring, This shows the living room, You can see the reflective barrier in the roof. This will make the insulation more effective.
|
This is the shower enclosure for the bathroom on the lower level.
![]() |
| Vent pipe for kitchen was cut when window was installed. It will be connected. |
![]() |
| Marty, the plumber from Stackhouse Plumbing had to cut through the brick,and block to get the pipes to connect. Shower plumbed for Master Bathroom |
![]() |
| Plumbing and Electric for Master bath vanity |
![]() |
Ready for Fireplace installation |
We also have had the men here putting on the siding. We are using Hardi plank shingles, and will paint them a cedar like tan, and have white trim.
![]() |
| Adding siding to the livingroom side. View from birdfeeder. |
![]() |
| View from the dock. |