Walls are being taken down that connect the current house to the addition. Electric, Plumbing and Mechanical rough-in is complete. We will have the inspector here on Monday.
the sliding glass door leading to the porch has been installed, and the installation of the flooring for the porch is almost complete.
Work has been done on the siding, and the roof.
No comments:
Post a Comment